PROYAPI A.Ş. ProYapi Mühendislik Müşavirlik Çerez Politikası 



PROJECT DETAILS

Country:
Turkey
Location Within Country:
Kahramanmaraş
Name of Client:
CEAS, Çukurova Electric Contractor: Italstrade Constructon Inc.
Start date (month/year):
1987
End Date (month/year):
1990
Kaynak:
National Fund

PROJECT NAME:

SIR Dam and HEPP



TYPE OF SERVICE:

Design and Engineering Services



OTHER DETAILS:

Function: Power production Unit capacity: 91 MW Capacity : 273 MW No of generators: 3 Type of generators : 3 Phase, Synchronized Type: Thin Concrete, double curvature arch dam with variable radius and thickness Crest Height: 125,5 m Crest length: 357 m Amount of concrete: 420,000 m3 Spillway Type: variable width, open channel Discharge capacity: 6460 m3/sec Type of gates: Radial No of gates: 3 Dimension of gates: 17,8 x 13 m. Power plant Type: Semi-buried Type of turbines: Vertical Francis No of units: 3